Cooling That Rides Through Power Cuts: 250 kW Solar and 600 kWh Battery at a Mushroom Plant in Mainpuri

| Client | Kapil Muni Agro Foods |
|---|---|
| Location | Bewar, Mainpuri, UP |
| System | 250 kW + 600 kWh Hybrid |
| Hybrid power conditioning unit | Fuji Electric, 250 kW |
| Backed-up loads | Critical loads, mainly cooling and the canning line: about 150 kW, for about 2 hours on battery alone |
| Commissioned | July 2021 |
| MGetEnergy scope | EPC, hybrid solar and battery integration, commissioning, five year CAMC (2021 to 2026) |
Kapil Muni Agro Foods grows mushrooms at Bewar in Mainpuri district and takes them all the way to the shelf on the same site: growing, processing, canning and packing. In July 2021 we commissioned a 250 kW hybrid solar plant with a 600 kWh gel battery bank and 250 kW of Fuji Electric hybrid power conditioning.
When the grid fails, the battery carries the critical load, about 150 kW of cooling and canning, for around two hours. We maintained the plant for its first five years under a CAMC that ran from 2021 to 2026, and the same owner came back to us in 2022 to solarise Kapil Muni Children Academy.
A mushroom plant cannot pause its cooling
Fresh mushrooms spoil fast, and the growing rooms run to controlled temperature and humidity around the clock. A power cut is not an inconvenience here. Cooling that stops puts the crop and the stored stock at risk, and a canning line that stops mid-batch means product that has to be checked or written off.
Running on a 250 kW generator
Before solar, every cut meant starting the site's 250 kW diesel generator. That kept the plant alive but came with all the usual problems: a fuel bill that rose with every cut, running hours and maintenance on the generator, and diesel pilferage, which is hard to control on a large rural site.
The owner wanted the critical loads off diesel during outages, not just cheaper daytime power.
Why ordinary on-grid solar would not have helped
A standard on-grid inverter shuts down the moment the grid fails. It has to, so that it cannot feed a dead line. On-grid solar alone would have cut the daytime bill and done nothing during a power cut, which was the whole problem.
Riding through cuts needs a hybrid power conditioning unit, a battery, and control that decides which source feeds the load.
What we installed
- Solar array: 250 kW on the tin shed roof of the plant
- Hybrid power conditioning: Fuji Electric, 250 kW, matched to the array
- Battery: gel cells, 2 V each, on steel racks in a dedicated battery room, 600 kWh nominal
- Protection, distribution and the changeover to the critical load circuits
We chose gel because the battery room sits in a hot climate and has to run for years with little attention. Gel cells are sealed, need no topping up and tolerate heat better than flooded batteries.
To protect their life, gel banks are normally cycled to about half their depth, so the usable energy is about 300 kWh of the 600 kWh nominal. That is what sets the two hours at 150 kW.
How the system runs through a day and a power cut
- Daytime, grid present: solar feeds the plant first and charges the battery with what is left
- Power cut: the hybrid unit carries the critical loads, cooling and canning, from solar and the battery together
- Grid returns: the system goes back to normal mode and the battery recharges for the next outage
In a daytime cut the sun stretches the backup well beyond two hours. At night, at about 150 kW, the bank carries roughly two hours.
Estimated diesel avoided
This is an estimate, not a metered figure. At about 150 kW of critical load, a 250 kW diesel generator burns roughly 0.3 litres per kWh, or about 45 litres an hour.
With 2 to 3 hours of cuts a day now carried by the battery, that is about 90 to 135 litres a day, or about 33,000 to 49,000 litres of diesel a year that the generator no longer burns during outages. This does not count the daytime diesel the 250 kW of solar also displaces.
Maintained for its first five years
We looked after the plant for its first five years under a CAMC that ran from 2021 to 2026. It covered:
- Battery checks: terminal condition and tightness, cleaning, and cell by cell voltage readings to catch a weak cell early
- Hybrid unit checks: fault log review, charging settings, ventilation and cooling
- Solar array: module cleaning and inspection of the mounting and fixings
- Protection: earthing and isolator checks
A client who came back
In 2022 the same owner asked us to solarise Kapil Muni Children Academy at Bewar: a 25 kW hybrid system with a 36 kWh battery. A repeat order from a client who has lived with our work for a year says more than any brochure.
What this means for other food processors
For a plant where a power cut spoils product, size the battery for the loads that must not stop and the hours they must run, not for the solar array. Here the critical load is about 150 kW out of a 250 kW system, and that number, not the array size, set the battery.
Frequently asked questions
Can a mushroom or food processing plant keep its cooling running on solar during a power cut?
Yes, with a hybrid power conditioning unit and a battery sized for the critical load. A standard on-grid inverter switches off when the grid fails, even in full sun.
How long does the battery backup last at Kapil Muni Agro Foods?
About two hours at night at the roughly 150 kW critical load. In a daytime cut, solar stretches it well beyond that.
Why gel batteries?
They are sealed, need no topping up and handle heat better than flooded batteries, which suits a rural battery room that has to run for years with little attention.
How much diesel does it save?
An estimated 33,000 to 49,000 litres a year during outages, based on 2 to 3 hours of daily cuts at about 150 kW. This is an estimate, not a metered figure.
What size is the system?
250 kW of solar on a tin shed roof, 250 kW of Fuji Electric hybrid power conditioning and a 600 kWh nominal gel battery bank, commissioned in July 2021.
Who maintained it?
MGetEnergy, for its first five years under a CAMC that ran from 2021 to 2026.
Planning solar with battery backup for a food processing or agro plant?
MGetEnergy designs, installs and maintains hybrid solar and battery systems for food processors, cold chains and agro plants where a power cut spoils product. Tell us which loads must never stop and for how long, and we will size the battery around them.
+91 98218 76325 wecare@mgetenergy.com
Request a site assessment