A Petrol Pump with No Generator: 20 kW Hybrid Solar and Battery Backup at Adhiraj HP, Greater Noida

20 kWp solar array on a raised steel frame above the sales building at Adhiraj HP petrol pump, Aminabad, Greater Noida
ClientAdhiraj HP
LocationAminabad, Greater Noida, UP
System20 kW + 36 kWh Hybrid
Hybrid power conditioning unitFuji Electric, 20 kW
Backed-up loadsThe whole outlet: fuel dispensers, billing and payment, lighting, CCTV, network and sales office
CommissionedAugust 2024
MGetEnergy scopeEPC, hybrid solar and battery integration, commissioning, five year CAMC
Maintenance contractCAMC, 2024 – 2029

Adhiraj HP is a fuel station at Aminabad, Greater Noida. It has no diesel generator. When grid power fails, the only thing keeping its dispensers, billing and lights running is the hybrid solar and battery system we installed and commissioned in August 2024.

The system pairs a 20 kWp rooftop solar array of half-cut mono PERC modules with a 20 kW Fuji Electric hybrid power conditioning unit, or PCU, and a 240 V battery bank of 36 kWh nominal capacity. Solar serves the station by day and charges the batteries. The batteries carry the station through power cuts. We have maintained the plant since commissioning under a five year CAMC that runs to 2029.

A fuel station cannot run on half its load

A petrol pump sells fuel through a chain of equipment. The dispenser pumps the fuel, but the sale also needs the dispenser controls, the billing terminal, the payment machine, the network connection and, after dark, the forecourt lighting. If any link in that chain loses power, the sale stops.

Many outlets cover power cuts with a diesel generator. Adhiraj HP has none. So whatever supplied power during an outage had to carry the whole station, take over without anyone switching it on, and do it every time the grid dropped.

Why ordinary on-grid solar would not have helped

A standard on-grid solar inverter switches itself off the moment grid power fails. This protection is called anti-islanding, and it exists so that a solar plant cannot keep feeding lines that line staff may be working on. The panels can sit in full sunlight and the station would still go dark.

Keeping a station running through an outage needs three things working together: a hybrid inverter that can form its own supply when the grid is absent, a battery to store energy, and a controller that decides, moment to moment, where power comes from. That is what we built here.

Twenty 12 V, 150 Ah batteries on steel racks forming the 240 V, 36 kWh battery bank at Adhiraj HP, Greater Noida

What we installed

  • Solar array: 20 kWp of half-cut mono PERC modules on a raised steel frame above the sales building roof, clear of the forecourt, so no vehicle or customer space was used
  • Hybrid PCU: Fuji Electric, 20 kW, managing solar, grid and battery power and supplying the station load
  • Battery bank: twenty 12 V, 150 Ah lead-acid batteries connected in series to give 240 V DC, on steel racks in a dedicated room
  • Storage: 240 V x 150 Ah = 36 kWh nominal
  • Protection and distribution: isolation, earthing and switching between the PCU and the station distribution board, so the whole outlet is fed through the hybrid system

Connecting batteries in series adds their voltages while the ampere-hour rating stays the same. That is how twenty 12 V units become one 240 V bank matched to the PCU's battery input.

The 36 kWh figure is the nominal capacity on the label. Lead-acid batteries last longer when they are not drained completely, so the PCU stops discharging well before empty. The usable share is lower than 36 kWh, and that is a deliberate trade for battery life.

The solar array and the PCU are matched one to one: 20 kWp of panels on a 20 kW PCU. The PCU has room for the full midday output of the array, and the array is large enough to run the daytime load and recharge the batteries.

How the system runs through a day and a power cut

  • Daytime, grid present: solar supplies the running load first, surplus solar charges the batteries, and the grid tops up whenever solar falls short
  • Power cut: the PCU keeps supplying the station from the batteries and from whatever solar is available, so dispensing, billing and lighting carry on
  • Grid returns: the PCU goes back to normal mode, and solar and grid recharge the batteries ready for the next outage

How long the batteries last in a power cut depends on how much the station is drawing at that moment and on whether the sun is up. A daytime outage with good sun lasts far longer than one at night, because solar is still feeding the load. For that reason we do not quote a fixed number of backup hours.

Fuji Electric 20 kW hybrid power conditioning unit in the equipment room at Adhiraj HP petrol pump, Greater Noida

Maintained by the people who built it

A battery-backed plant is only as reliable as its batteries. At a station with no generator to fall back on, maintenance has to be routine rather than on call. Our five year CAMC covers:

  • Battery checks: terminal condition and tightness, cleaning, electrolyte level on flooded cells, and cell by cell voltage readings to catch a weak unit early
  • PCU checks: fault log review, charging settings, ventilation and cooling
  • Solar array: module cleaning and inspection of the raised frame and its fixings
  • Protection: earthing and isolator checks

What this means for other fuel stations

Solar at a petrol pump is usually judged on units generated. At a station without a generator, the more important measure is whether the forecourt keeps selling when the grid drops. That has to be designed from the full operating load of the station, not from the size of the roof.

The same approach suits other customer-facing sites where a short outage stops trade, such as retail outlets, clinics and small cold stores. The design questions do not change: what must keep running, for how long, and what supplies it when the sun is down.

Frequently asked questions

Can a petrol pump keep running on solar during a power cut?

Only with a hybrid inverter and a battery. A standard on-grid solar inverter shuts down when the grid fails, even in full sun. At Adhiraj HP, a 20 kW Fuji Electric hybrid PCU and a 36 kWh battery bank keep the whole station running through outages.

Does this petrol pump have a diesel generator?

No. The hybrid solar and battery system is the only backup at the station, which is why it was designed to carry the full load, including the dispensers, billing, payment, lighting and CCTV.

How long does the battery backup last?

It depends on the load at the time and on whether solar is still generating. The bank is 36 kWh nominal, and the PCU keeps part of that in reserve to protect the batteries. A daytime outage lasts much longer than a night-time one.

What size is the system?

A 20 kWp rooftop solar array of half-cut mono PERC modules, a 20 kW Fuji Electric hybrid PCU, and twenty 12 V, 150 Ah batteries in series forming a 240 V, 36 kWh nominal bank. It was commissioned in August 2024.

Who maintains the system?

MGetEnergy, under a five year CAMC running to 2029 that covers the batteries, the PCU, the solar array and the protection equipment.

Planning solar with battery backup for a fuel station or retail site?

MGetEnergy designs, installs and maintains hybrid solar and battery systems for petrol pumps, retail outlets and other sites where a power cut stops trade, across Delhi NCR and beyond.